huntington beach banner
File #: 20-1821    Version: 2
Type: Public Hearing Status: Agenda Ready
File created: 8/5/2020 In control: Design Review Board
On agenda: 8/13/2020 Final action:
Title: DESIGN REVIEW BOARD NO. 20-002 (714 PACIFIC COAST HIGHWAY MIXED USE PROJECT) REQUEST: To review the design, colors, and materials of a new three-story 12,713 sq. ft. mixed use building which includes a 766 sq. ft. ground floor retail coffee shop, three (3) two bedroom residential units on the second and third floor, and a 149 sq. ft. rooftop deck. LOCATION: 714 Pacific Coast Highway, 92648 (North side of PCH, 115 linear feet south of the intersection of 7th Street at PCH)
Attachments: 1. Att #1 Plans 5-19-20
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

DESIGN REVIEW BOARD STAFF REPORT

 

TO:                     Design Review Board

FROM:                     Hayden Beckman, Senior Planner

 

SUBJECT:

title

DESIGN REVIEW BOARD NO. 20-002 (714 PACIFIC COAST HIGHWAY MIXED USE PROJECT)

 

REQUEST:

To review the design, colors, and materials of a new three-story 12,713 sq. ft. mixed use building which includes a 766 sq. ft. ground floor retail coffee shop, three (3) two bedroom residential units on the second and third floor, and a 149 sq. ft. rooftop deck.

 

LOCATION:

714 Pacific Coast Highway, 92648 (North side of PCH, 115 linear feet south of the intersection of 7th Street at PCH)

body

 

APPLICANT/

PROPERTY
OWNER:
                     Thanh Dong, Phat Huong Haanh Holdings, LLC, 18961 Flagstaff Lane, Huntington Beach CA 92646

 

 

 

STAFF RECOMMENDATION:

recommendation

That the Design Review Board take the following actions:

 

A)                     Recommend approval of Design Review Board No. 20-002 to the Zoning Administrator.

end

 

General Plan:

M-sp (Mixed Use - Specific Plan Overlay)

 

Zone:

SP5-CZ (Downtown Specific Plan - Downtown Core Mixed Use District) - Coastal Zone Overlay

 

Existing Use:

Vacant

 

ATTACHMENTS:

1.                     Site plan, floor plans, elevations, and conceptual renderings received and dated May 19, 2020