Skip to main content
huntington beach banner
File #: 19-1287   
Type: Public Hearing Status: Passed
File created: 12/19/2019 In control: Planning Commission
On agenda: 1/28/2020 Final action:
Title: CONDITIONAL USE PERMIT NO. 19-014 (7-11 GAS STATION AND CONVENIENCE STORE) REQUEST: To demolish an existing auto repair building and construct a 2,323 s.f. convenience store operating 24 hours per day with Type 20 (Off-Sale Beer and Wine) ABC license and an eight pump fueling station. LOCATION: 16171 Beach Boulevard (west side of Beach Boulevard at the intersection of Stark Drive)
Attachments: 1. Att #1 Findings and Conditions, 2. Att #2 Vicinity Map, 3. Att #3 Narrative, 4. Att #4 Plans received November 22, 2019, 5. Att #5 Code Requirements
PLANNING COMMISSION STAFF REPORT

TO: Planning Commission
FROM: Ursula Luna-Reynosa, Community Development Director
BY: Nicolle Aube, AICP, Associate Planner

SUBJECT:
title
CONDITIONAL USE PERMIT NO. 19-014 (7-11 GAS STATION AND CONVENIENCE STORE)

REQUEST:
To demolish an existing auto repair building and construct a 2,323 s.f. convenience store operating 24 hours per day with Type 20 (Off-Sale Beer and Wine) ABC license and an eight pump fueling station.

LOCATION:
16171 Beach Boulevard (west side of Beach Boulevard at the intersection of Stark Drive)
body

APPLICANT:
Adan Madrid, ASI Development, 5932 Bolsa Avenue, Suite 107, Huntington Beach, CA 92649

PROPERTY
OWNER:
Cathy Hoover, AF HGBM, LLC, 2521 Fairmount Street, Dallas, TX 75201

BUSINESS
OWNER:
Not applicable.



STATEMENT OF ISSUE:

1. Is the project proposal consistent with the City of Huntington Beach land use regulations (i.e., General Plan land use designation, Zoning Map and Zoning Code including any specific plans and overlay districts where applicable)?
2. Does the project proposal satisfy all the findings required for approving a Conditional Use Permit?
3. Has the appropriate level of environmental analysis been determined?


RECOMMENDATION:
recommendation
That the Planning Commission take the following actions:

A) Find the proposed project categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303, Class 3 - New Construction or Conversion of Small Structures.
B) Approve Conditional Use Permit No. 19-014 with suggested findings and conditions of approval (Attachment No. 1)

end

ALTERNATIVE ACTION(S):
A) Don't make the suggested findings, which will result in a mandatory denial per Section 241.10(c) of the Zoning Code.
B) Continue Conditional Use Permit No. 19-014 and direct staff accordingly.

PROJECT PROPOSAL:

The project site is approximately 0.50 acre and consists of one existing vacant building that formerly operated as a Firestone auto...

Click here for full text