File #: 23-577   
Type: Consent Calendar Status: Passed
File created: 6/26/2023 In control: City Council/Public Financing Authority
On agenda: 7/18/2023 Final action: 7/18/2023
Title: Accept the lowest responsive and responsible bid and authorize execution of a construction contract with Premo Construction in the amount of $364,095 for the Well 9 Roof Replacement Project, CC1687.
Attachments: 1. Att #1 PowerPoint Presentation, 2. Att #2 Location Map
REQUEST FOR CITY COUNCIL ACTION

SUBMITTED TO: Honorable Mayor and City Council Members

SUBMITTED BY: Al Zelinka, City Manager

VIA: Alvin Papa, Acting Director of Public Works

PREPARED BY: John Dettle, Associate Civil Engineer

Subject:
title
Accept the lowest responsive and responsible bid and authorize execution of a construction contract with Premo Construction in the amount of $364,095 for the Well 9 Roof Replacement Project, CC1687.
body

Statement of Issue:
On June 22, 2023, bids were publicly opened for the Well 9 Roof Replacement Project, CC1687. City Council action is requested to award the construction contract to Premo Construction, Inc., the lowest responsive and responsible bidder.

Financial Impact:
The total cost of the project, including contingency and inspection is $425,505. Funds in the amount of $328,205 are available in Water Fund account 50691043.82100. Staff is requesting an appropriation of $97,300 from the undesignated Water Fund balance to fund the remainder.

Recommended Action:
recommendation
A) Accept the lowest responsive and responsible bid submitted by Premo Construction, Inc. in the amount of $364,095;

B) Authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney; and

C) Appropriate $97,300 from the Water Fund to account 50691043.82100.
end

Alternative Action(s):
Reject all bids, and direct staff to rebid the project.

Analysis:
Water Production Staff identified that the Well 9 facility was vulnerable to fire risk, due to excessive heat buildup in the exhaust system caused by insufficient ventilation; the ventilation system automatically shuts off when the facility doors are not fully closed. Staff immediately implemented a standard procedure to keep the engine room door closed at all times. However, in the absence of a permanent structural solution, the Well 9 facility would remain at risk of fire and a lengthy shutdown as repairs are made. A well shu...

Click here for full text