Skip to main content
huntington beach banner
File #: 26-088   
Type: Consent Calendar Status: Agenda Ready
File created: 1/20/2026 In control: City Council/Public Financing Authority
On agenda: 2/3/2026 Final action:
Title: Reject All Bids for Main Street Branch Library HVAC and Electrical Improvements (CC-1790) and Direct Staff to Re-Bid
Attachments: 1. Att #1 PowerPoint Presentation
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
REQUEST FOR CITY COUNCIL ACTION

SUBMITTED TO: Honorable Mayor and City Council Members

SUBMITTED BY: Travis Hopkins, City Manager

VIA: Chau Vu, Director of Public Works

PREPARED BY: Frank Drevdahl, Capital Projects Administrator

Subject:
title
Reject All Bids for Main Street Branch Library HVAC and Electrical Improvements (CC-1790) and Direct Staff to Re-Bid
body

Statement of Issue:
On November 4, 2025, the Public Works Department (the "Department") received two (2) bids for the Main Street Branch Library HVAC and Electrical Improvements Project. Both bids exceeded the project's currently allocated budget of $463,000. Staff recommends that the City Council reject all bids to allow further evaluation of project scope, funding, and delivery options in light of current utility requirements and market conditions.

Financial Impact:
There are no fiscal impacts related to the recommended action.

Recommended Action:
recommendation
Reject all bids for CC-1790, Main Street Branch Library HVAC and Electrical Improvements.
end

Alternative Action(s):
Do not accept the recommended action, and direct staff accordingly.

Analysis:
The City of Huntington Beach (the "City") Main Street Branch Library (the "Library") is located at 525 Main Street in Triangle Park. Built in the 1950s, the Library is a concrete tilt-up structure with limited central heating and no central air conditioning. As a result, interior temperatures can fluctuate significantly, periodically impacting library operations and resulting in temporary closures.

To address these conditions, staff retained Westburg White Architecture in September 2024 to prepare design documents for HVAC and electrical improvements. The project scope included upgrading electrical capacity, construction of a dedicated electrical room, provisions for future mechanical expansion, and installation of multiple air conditioning and heat pump units throughout the building.

During final design coordination, Sout...