File #: 25-796   
Type: Consent Calendar Status: Agenda Ready
File created: 9/30/2025 In control: CIAB/Public Works Commission
On agenda: 10/15/2025 Final action:
Title: Zone 3 Residential Pavement Project - Tree Removals and Tree Replacements
Attachments: 1. PowerPoint Presentation
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
CIAB/PUBLIC WORKS COMMISSION
REQUEST FOR ACTION

SUBMITTED TO: MEMBERS OF CIAB/PUBLIC WORKS COMMISSION

SUBMITTED BY: Chau Vu, Director of Public Works

PREPARED BY: Denny Bacon, Operations Manager

Subject:
title
Zone 3 Residential Pavement Project - Tree Removals and Tree Replacements
body

Statement of Issue:
Approximately 60 parkway trees (?10%) must be removed and replaced to facilitate concrete and drainage improvements as part of the Zone 3 Residential Overlay and Slurry Seal Project. The removals are necessary to address infrastructure damage caused by tree roots and to ensure proper drainage and improve paths of travel for pedestrians.

Financial Impact:
The total project cost is estimated at $60,000 and will be included in the Public Works Department's Capital Improvement Program budget for the Zone 3 Residential Overlay and Slurry Seal Project.

Recommended Action:
recommendation
Authorize the removal and one-for-one replacement of approximately 60 parkway trees (?10%) to facilitate the Zone 3 Residential Overlay and Slurry Seal Project.
end

Alternative Action(s):
Do not Authorize the removal and one-for-one replacement of approximately 60 parkway trees (?10%) to facilitate the Zone 3 Residential Overlay and Slurry Seal Project and direct staff accordingly.

Analysis:
This report is submitted to provide justification for the removal of approximately 60 parkway trees (?10%) and subsequent replanting within Maintenance Zone 9.

The Pavement Management Plan divides the City into 12 maintenance zones, numbered 1 through 12. Zone 3 is scheduled for improvements in Fiscal Year 2025/26. This will mark the second maintenance cycle through these zones.

The Zone 3 Residential Overlay and Slurry Seal Project includes approximately 8 miles of pavement overlay and 8.5 miles of slurry seal. Additional scope of work includes curb, gutter, and sidewalk replacement; zone-wide tree trimming; crack sealing; localized pavement repair (slurry preparation); utility ...