Skip to main content
huntington beach banner
File #: 23-208   
Type: Administrative Items Status: Agenda Ready
File created: 2/27/2023 In control: Design Review Board
On agenda: 3/9/2023 Final action:
Title: DESIGN REVIEW NO. 23-001 (1 OZ. COFFEE FA?ADE REMODEL) REQUEST: To review the design, colors, and materials of a fa?ade remodel to an existing ground floor commercial tenant space. LOCATION: 155 5th Street, Suite 121 (west of 5th Street, between Pacific Coast Highway and Walnut Avenue)
Attachments: 1. Att. #1 - Suggested Conditions of Approval, 2. Att. #2 - Project Plans dated January 31, 2023, 3. Att. #3 - Digital Colors and Materials dated February 21, 2023, 4. Att. #4 - Colored Elevations dated January 31, 2023, 5. Att. #5 - The Strand Inspiration Board
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

DESIGN REVIEW BOARD STAFF REPORT

 

TO:                     Design Review Board

FROM:                     Madalyn Welch, Associate Planner/ Ricky Ramos, Principal Planner

 

SUBJECT:

title

DESIGN REVIEW NO. 23-001 (1 OZ. COFFEE FAÇADE REMODEL)

 

REQUEST:

To review the design, colors, and materials of a façade remodel to an existing ground floor commercial tenant space.

 

LOCATION:

155 5th Street, Suite 121 (west of 5th Street, between Pacific Coast Highway and Walnut Avenue)

body

 

APPLICANT:

Phil Edmondson, Pacific Coast Architects, 305 Orange Avenue, Suite B, Huntington Beach, CA 92648

 

PROPERTY

OWNER:

Gary Jabara, 5th AND PCH, LLC, 1945 Placentia Avenue, Building D, Costa Mesa, CA 92627

 

 

 

STAFF RECOMMENDATION:

recommendation

That the Design Review Board take the following actions:

 

A)                     Approve Design Review No. 23-001 with conditions of approval.

 

end

 

General Plan:

M-sp (30-50 du/ac) (Mixed Use - Specific Plan Overlay; 30 to 50 dwelling units per acre)

 

Zone:

SP5-CZ (District 1, Downtown Specific Plan with Coastal Zone Overlay)

 

Existing Use:

Vacant commercial tenant space

 

ATTACHMENTS:

1.                     Suggested Conditions of Approval

2.                     Project Plans received and dated January 31, 2023

3.                     Colors and Materials Board received and dated February 21, 2023

4.                     Colored Elevations received and dated January 31, 2023

5.                     The Strand Inspiration Board