|
Title:
|
GENERAL PLAN AMENDMENT NO. 20-001/ZONING TEXT AMENDMENT NO. 20-002/ TENTATIVE PARCEL MAP NO. 21-103/CONDITIONAL USE PERMIT NO. 19-021/ENVIRONMENTAL ASSESSMENT NO. 21-001 (GOLDENWEST/GARFIELD COMMERCIAL)
REQUEST:
GPA: To amend the General Plan designation from Industrial-Specific Plan (I-sp) to Commercial Neighborhood-Specific Plan (CN-sp); ZTA: To amend the zoning designation within the Holly Seacliff Specific Plan (SP9) from Industrial to Commercial; TPM: To consolidate eight lots into a 1.32 net acre site comprised of two parcels; CUP: To construct a service station consisting of two canopies at an overall height of 19 ft., 14 pumps, a 233 sq. ft. payment kiosk at 13 ft. in height and a 3,588 sq. ft. drive-thru carwash tunnel at an overall height of 30 ft. with six vacuum stalls on a vacant site with a grade differential of more than three feet; and EA: To analyze the potential environmental impacts of the proposed project through Addendum No. 2 to the Holly-Seacliff Specific Plan c...
|