File #: 24-387   
Type: Consent Calendar Status: Passed
File created: 5/9/2024 In control: City Council/Public Financing Authority
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Accept the lowest responsive and responsible bid and authorize execution of a construction contract with RJ Noble in the amount of $4,046,298.55 for the FY 23/24 Arterial Rehabilitation Project, CC-1741
Attachments: 1. Att 1 PowerPoint Presentation

REQUEST FOR CITY COUNCIL ACTION

 

SUBMITTED TO:                     Honorable Mayor and City Council Members                     

 

SUBMITTED BY:                     Eric G. Parra, Interim City Manager                     

 

VIA:                     Chau Vu, Director of Public Works

 

PREPARED BY:                     Eduardo Cerda, Assistant Civil Engineer

 

Subject:

title

Accept the lowest responsive and responsible bid and authorize execution of a construction contract with RJ Noble in the amount of $4,046,298.55 for the FY 23/24 Arterial Rehabilitation Project, CC-1741

body

 

Statement of Issue:

On May 8, 2024, bids were publicly opened for the FY 23/24 Arterial Rehabilitation Project. City Council action is requested to award the construction contract to RJ Noble, the lowest responsive and responsible bidder.

 

Financial Impact:

Total cost for the project is $4,650,000 with the breakdown as follows:

 

Construction - Base Bid

$3,731,899.35

Construction - Additive Alternative

$   314,399.20

Contingency

$   404,629.86

Material and Inspection Services

$   199,071.59

Total Project Cost

$4,650,000.00

 

Funds for this project are available in the current fiscal budget as follows:                                                                                    

 

RMRA

Acct.

124790007.82000

$ 4,215,212

Measure M

Acct.

21390033.82300

$    110,000

Infrastructure Fund

Acct.

31444005.82300

$    324,788

Total Funds Available

 

$ 4,650,000

 

 

Recommended Action:

recommendation

A)                     Accept the lowest responsive and responsible bid submitted by RJ Noble in the amount of $4,046,298.55 (Base Bid + Alternative Bid); and,

 

B)  Authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney.

end

 

Alternative Action(s):

Reject all bids and provide staff with direction.

 

Analysis:

This project will rehabilitate approximately two (2) miles of arterial streets. The streets included within the project include:

                     Edinger Ave: Saybrook to Countess

                     Talbert Ave: Edwards to End of West City Limits

Both streets will have new asphalt concrete pavement or slurry seal, utilities adjusted to grade, traffic loops, and striping. Improvements will also include limited replacement of concrete curbs, gutters, sidewalks, access ramps, and trees. The two (2) street segments have been chosen per the Pavement Management Plan with Pavement Condition Indexes (PCIs) that received poor ratings, warranting rehabilitation.

This project uses a recyclable paving material, Rubberized Asphalt Concrete (RAC), which contains crumb rubber derived from 100% California waste tire rubber. A two (2)-inch layer of RAC includes over 2,000 waste tires per lane mile. This project will divert approximately 10,000 waste tires that would otherwise end up in a landfill. The use of RAC in the rehabilitation of the City’s arterial streets has resulted in the diversion of more than 400,000 waste tires.

Additionally, this project will rehabilitate one alley on Indianapolis Ave (Farnsworth to Sandpiper). The alley has a PCI rating of 9, which is a failed score, and thus, requires rehabilitation. The improvements will include new pavement, concrete v-gutter, and reconstruction of the driveway approaches.

Bids were opened on May 8, 2024, with the following results:

Bidder’s Name

Bid Amount

RJ Noble

$4,046,298.55

Sequel Contractors

$4,149,138.25

Excel Paving

$4,199,906.25

All American Asphalt

$4,406,678.00

Hardy & Harper

$4,465,000.00

Onyx Paving Company

$4,888,000.00

 

Staff recommends awarding a contract to RJ Noble in the amount of $4,046,298.55. RJ Noble has successfully completed similar arterial construction projects in the City including the most recent Banning Street Rehabilitation. The total project cost is estimated to be $4,650,000, which includes the construction costs, construction contingency, inspection, and supplemental services (soils and materials testing).

 

 

Environmental Status:

This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15031c under Class 1 of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment.

 

Strategic Plan Goal:

Non Applicable - Administrative Item

 

Attachment(s):

1.                     PowerPoint