Skip to main content
huntington beach banner
File #: 25-358   
Type: Consent Calendar Status: Agenda Ready
File created: 4/30/2025 In control: City Council/Public Financing Authority
On agenda: 5/20/2025 Final action:
Title: Accept the lowest responsive and responsible bid and authorize execution of a construction contract with Power Engineering Construction Company in the amount of $353,068 for the Bolsa Avenue Bridge Maintenance Project, CC-1745; approve supplemental construction costs; and authorize 15% in contingency funds
Attachments: 1. Att #1 Power Engineering Agreement, 2. Att #2 Vicinity Map, 3. Att #3 PowerPoint Presentation
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

REQUEST FOR CITY COUNCIL ACTION

 

SUBMITTED TO:                     Honorable Mayor and City Council Members                     

 

SUBMITTED BY:                     Travis Hopkins, City Manager                     

 

VIA:                     Chau Vu, Director of Public Works

 

PREPARED BY:                     Joseph Pinel, Capital Projects Administrator

 

Subject:

title

Accept the lowest responsive and responsible bid and authorize execution of a construction contract with Power Engineering Construction Company in the amount of $353,068 for the Bolsa Avenue Bridge Maintenance Project, CC-1745; approve supplemental construction costs; and authorize 15% in contingency funds

body

 

Statement of Issue:

On April 10, 2025, the City publicly opened bids for the Bolsa Avenue Bridge Maintenance Project (CC-1745). City Council action is requested to award the construction contract to Power Engineering Construction Company, the lowest responsive and responsible bidder.

 

Financial Impact:

The estimated project cost is $461,336 which includes the construction contract with Power Engineering Construction Company, supplemental construction costs, and a 15% contingency.  The project budget includes $120,781 of Prop 42 funds from Account No. 21985203.82800 and $340,555 from the Measure M fund in Account No. 21390040.82300. 

 

Recommended Action:

recommendation

A)                     Accept the lowest and responsible bid submitted by Power Engineering Construction Company in the amount of $353,068;

 

B)                     Authorize the Director of Public Works to approve change orders up to 15% contingency in potential construction change orders; and,

 

C)                     Authorize the Mayor and City Clerk to execute a construction contract with Power Engineering Construction Company in a form approved by the City Attorney.

end

 

Alternative Action(s):

Reject all bids and provide staff with direction.

 

Analysis:

The Bolsa Avenue Bridge Maintenance Project will extend the service life of the bridge over the Westminster Channel and help prevent more extensive and costly rehabilitation in the future. The project scope includes:

                     Removal of the existing one-foot parapet and five-foot fence to be replaced with a traffic-rated three-foot barrier and four-foot fence

                     Removal of unsound concrete and patching

                     Epoxy injection for concrete cracks

                     Replacement of joint seals

                     Sidewalk restoration

                     Limited cleaning and waterproof painting

                     Replacement of water line structural brackets

                     Replacement of the water line air vacuum release valve assembly

 

Bid Results (Opened April 10, 2025):

 

Bidder’s Name

Submitted and Verified Bid

Power Engineering Construction Company

$353,068

Leonida Builders Inc.

$393,978

Lonerock, Inc.

$700,565

 

Based on the lowest bid received, the total estimated construction cost of this project is $461,336, as itemized below:

 

Item

Amount

Bid submitted by Power Engineering Construction Company

$353,068

15% Contingency

$52,961

Supplementals (Deputy inspection, construction administration)

$55,307

TOTAL CONSTRUCTION COST

$461,336

 

Funds for this project are available in the current fiscal budget as follows:

 

Prop 42

Acct. 21985203.82800

$120,781

Measure M

Acct. 21390040.82300

$340,555

Total Funds Available:                                                                                       $461,336

 

Staff has reviewed Power Engineering Construction Company’s qualifications and confirms that they have successfully completed similar bridge maintenance projects. Based on their experience and the submitted bid, staff recommends awarding the contract as outlined.  The total project cost is estimated to be $461,336, which includes the construction contract, supplemental construction costs (such as construction administration, design engineer services and deputy inspection), and 15% construction contingency.

 

Environmental Status:

This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15031c under Class 1 of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment.

 

Strategic Plan Goal:

Non Applicable - Administrative Item

 

Attachment(s):

1.                     Construction Contract with Power Engineering Construction Company

2.                     Vicinity Map

3.                     PowerPoint Presentation