Approve and Authorize the execution of Professional Service Contracts for On-Call Transportation Engineering Consulting Services with Advantec Consulting Engineers, Inc., AGA Engineers, Inc., Fehr & Peers, FPL and Associates, Inc., H.W. Lochner, Inc., and LG2WB Engineers, Inc. dba Linscott, Law & Greenspan, Engineers
body
Statement of Issue:
The Public Works Department requires on-call transportation engineering consulting services for as needed support to assist with the design and construction of capital improvement projects, which are identified in the annual Capital Improvement Program (CIP) and other traffic engineering services.
Financial Impact:
The City’s adopted Fiscal Year (FY) 2025/2026 Capital Improvement Program Budget totals $63.6 million for approved projects citywide. Each approved CIP project has a budget containing sufficient funding for design, environmental, engineering, construction, project management and other required costs. The six (6) recommended engineering contracts, totaling $6.0 million, will be funded within each project’s individual CIP budget as needed or as included in other budgeted operational tasks. As such, no additional funding is needed by this action.
Recommended Action:
recommendation
A) Approve and authorize the Mayor and City Clerk to execute a $1,000,000 “Professional Services Contract Between the City of Huntington Beach and Advantec Consulting Engineers, Inc. for On-Call Transportation Engineering Services”, and,
B) Approve and authorize the Mayor and City Clerk to execute a $1,000,000 “Professional Services Contract Between the City of Huntington Beach and AGA Engineers, Inc. for On-Call Transportation Engineering Services”, and,
C) Approve and authorize the Mayor and City Clerk to execute a $1,000,000 “Professional Services Contract Between the City of Huntington Beach and Fehr & Peers for On-Call Transportation Engineering Services”, and,
D) Approve and authorize the Mayor and City Clerk to execute a $1,000,000 “Professional Services Contract Between the City of Huntington Beach and FPL and Associates, Inc. for On-Call Transportation Engineering Services”, and,
E) Approve and authorize the Mayor and City Clerk to execute a $1,000,000 “Professional Services Contract Between the City of Huntington Beach and H.W. Lochner, Inc. for On-Call Transportation Engineering Services”, and,
F) Approve and authorize the Mayor and City Clerk to execute a $1,000,000 “Professional Services Contract Between the City of Huntington Beach and LG2WB Engineers, Inc. dba Linscott, Law & Greenspan, Engineers for On-Call Transportation Engineering Services”.
end
Alternative Action(s):
Do not authorize the contracts and direct staff accordingly. Budgeted capital improvement projects could be delayed until new contracts are approved.
Analysis:
On October 9, 2025, the City advertised a Request for Qualifications (RFQ) for On-Call Transportation Engineering Services. Statements of Qualifications (SOQ) were requested and submitted in compliance with Chapter 3.03 of the Huntington Beach Municipal Code. Twenty (20) Statements of Qualifications were received for transportation engineering services. In accordance with qualifications-based selection procurement, per the City of Huntington Beach Municipal Code, Section 3.03, “Professional Services”, the Public Works Department established a review board. Statements of qualifications were then evaluated and ranked by the review board. The top six (6) firms were selected.
The six (6) contracts recommended are for design services for capital improvement projects. These services have historically been used to supplement City staff to meet annual Capital Improvement Program (CIP) goals, act as an extension of City staff and provide the required expertise for unique projects. Each project is evaluated on a case-by-case basis to determine if these as-needed contract services are necessary.
Typical tasks for on-call transportation engineering consultants include the design of traffic signals, street lighting, geometric roadway design, signing and striping plans. They may also be assigned speed zone surveys, traffic safety studies, traffic signal coordination plan preparation and other specialized traffic engineering studies. The proposed contract amounts are a not-to-exceed amount for a three-year term with no guarantee of work or expenditure of the entire amount. Funding for any and all of these contract services is only through City Council authorization in the budget approval process.
Environmental Status:
Pursuant to CEQA Guidelines Section 15378(b)(5), administrative activities of governments that will not result in direct or indirect physical changes in the environment do not constitute a project.
Strategic Plan Goal:
Non Applicable - Administrative Item
For details, visit www.huntingtonbeachca.gov/strategicplan.
Attachment(s):
1. Advantec Consulting Engineers, Inc. Contract
2. AGA Engineers, Inc. Contract
3. Fehr & Peers Contract
4. FPL & Associates, Inc. Contract
5. H.W. Lochner, Inc. Contract
6. LG2WB Engineers, Inc. Contract
7. RCA Contract Agreement Summary
8. PowerPoint Presentation