File #: 23-382    Version: 1
Type: Consent Calendar Status: Agenda Ready
File created: 4/17/2023 In control: CIAB/Public Works Commission
On agenda: 5/17/2023 Final action:
Title: Well 9 Roof Replacement, CC-1687
Attachments: 1. Att # 1 Power Point Presentation, 2. Att # 2 Cost Estimate
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

PUBLIC WORKS COMMISSION

REQUEST FOR ACTION

 

                                                                                                                                                                                                                  

SUBMITTED TO:                     Chairman and Members of the Commission

 

SUBMITTED BY:                     Chau Vu, Acting Director of Public Works

 

Subject:

title

Well 9 Roof Replacement, CC-1687

body

 

Statement of Issue:

Plans and Specifications for Well 9 Roof Replacement, CC-1687, are in final preparation and ready for bidding.

 

Funding Source:

Funds in the amount of $281,000 are available for the project in Water Fund account 50691043.82100.  Any additional funds required to construct this project will be appropriated at the time of award.

 

Recommended Action:

recommendation

Motion to approve that the Well 9 Roof Replacement Project, CC-1687, is in general conformance with previously approved CIP.

end

 

Alternative Action(s):

Deny approval and recommend an alternative action.

 

 

Analysis:

Pumping well water saves the City approximately $200,000 a month in imported water costs, per typical water well. 

 

The roof at Well 10 caught fire in 2009 resulting in the well being shut down for two years.  There was excessive heat buildup in the exhaust system at Well 10 due to lack of ventilation and air flow across the natural gas engine and exhaust system.  Well 9 was designed with the same natural gas driven engine pumps, wood roof and ventilation system as Well 10.  This project will replace the wood roof at Well 9 with a concrete and steel decking roof, add wall openings and louvers in the engine room for ventilation and add a roof mounted ventilation fan to pull air across the engine and exhaust system and vent through the roof.

 

Well 9 is fenced in, but Public Works staff members have reported access and security concerns. Additional chain link gates are to be added to prevent access to the area behind the Well 9 engine room.

 

The Engineer’s Estimate is $384,000.

 

 