huntington beach banner
File #: 23-209    Version: 2
Type: Administrative Items Status: Agenda Ready
File created: 2/27/2023 In control: Design Review Board
On agenda: 3/9/2023 Final action:
Title: DESIGN REVIEW NO. 23-002 (TACOS LOS CHOLOS FA?ADE REMODEL) REQUEST: To review the design, colors, and materials of a fa?ade remodel to an existing ground floor commercial tenant space. LOCATION: 120 5th Street, Suite 100 (northeast corner of Pacific Coast Highway and 5th Street)
Attachments: 1. Att. #1 - Suggested Conditions of Approval, 2. Att. #2 - Project Plans dated January 31, 2023, 3. Att. #3 - Digital Colors and Materials Board dated January 31, 2023, 4. Att. #4 - Conceptual Colored Elevations dated January 31, 2023, 5. Att. #5 - The Strand Inspiration Board
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

DESIGN REVIEW BOARD STAFF REPORT

 

TO:                     Design Review Board

FROM:                     Madalyn Welch, Associate Planner / Ricky Ramos, Principal Planner

 

SUBJECT:

title

DESIGN REVIEW NO. 23-002 (TACOS LOS CHOLOS FAÇADE REMODEL)

 

REQUEST:

To review the design, colors, and materials of a façade remodel to an existing ground floor commercial tenant space.

 

LOCATION:

120 5th Street, Suite 100 (northeast corner of Pacific Coast Highway and 5th Street)

body

 

APPLICANT:

Phil Edmondson, Pacific Coast Architects, 305 Orange Avenue, Suite B, Huntington Beach, CA 92648

 

PROPERTY

OWNER:

Gary Jabara, 5th AND PCH, LLC, 1945 Placentia Avenue, Building D, Costa Mesa, CA 92627

 

 

 

STAFF RECOMMENDATION:

recommendation

That the Design Review Board take the following actions:

 

A)                     Approve Design Review No. 23-002 with conditions of approval.

end

 

General Plan:

M-sp (30-50 du/ac) (Mixed Use - Specific Plan Overview; 30 to 50 dwelling units per acre)

 

Zone:

SP5-CZ (District 1, Downtown Specific Plan with Coastal Zone Overlay)

 

Existing Use:

Vacant commercial tenant space

 

ATTACHMENTS:

1.                     Suggested Conditions of Approval

2.                     Project Plans received and dated January 31, 2023

3.                     Digital Colors and Materials Board received and dated January 31, 2023

4.                     Conceptual Colored Elevations received and dated January 31, 2023

5.                     The Strand Inspiration Board