File #: 20-1416    Version: 2
Type: Public Hearing Status: Passed
File created: 2/6/2020 In control: Zoning Administrator
On agenda: 2/19/2020 Final action:
Title: CONDITIONAL USE PERMIT NO. 19-030 (O'BRIEN WALL) REQUEST: To permit the installation of a 24 in. high glass wall extension on top of an existing 33.5 in. high wall for a maximum overall height of 57.5 inches in lieu of the maximum 42 in. allowable wall height within the front yard setback. LOCATION: 312 3rd Street, 92648 (East side of 3rd Street, midblock between Orange Avenue and Olive Avenue)
Attachments: 1. Att #1 Findings and Conditions of Approval.docx, 2. Att #2 Site Plan and Elevation Dated 11272019

ZONING ADMINISTRATOR STAFF REPORT

 

TO:                     Zoning Administrator

FROM:                     Hayden Beckman, Senior Planner

 

SUBJECT:

title

CONDITIONAL USE PERMIT NO. 19-030 (O’BRIEN WALL)

 

REQUEST:

To permit the installation of a 24 in. high glass wall extension on top of an existing 33.5 in. high wall for a maximum overall height of 57.5 inches in lieu of the maximum 42 in. allowable wall height within the front yard setback.

 

LOCATION:

312 3rd Street, 92648 (East side of 3rd Street, midblock between Orange Avenue and Olive Avenue)

body

 

APPLICANT/
PROPERTY

OWNER:

Devon and Darci O’Brien, 312 3rd Street, Huntington Beach CA 92648

 

 

STAFF RECOMMENDATION:

recommendation

That the Zoning Administrator take the following actions:

 

A)                     Approve Conditional Use Permit No. 2019-030 with suggested findings and conditions of approval.

end

 

General Plan:

M-sp-(30-50 du/ac) (Mixed Use - Specific Plan Overlay - Maximum 30 - 50 dwelling units per acre)

 

Zone:

SP5-CZ (Downtown Specific Plan - Coastal Zone Overlay)

 

Environmental Status:

The request is covered by Categorical Exemption Section 15301, Class 1, of the California Environmental Quality Act.

 

Coastal Status:

Non-Appealable

 

Existing Use:

Residential

 

ATTACHMENTS:

1.                     Findings and Conditions of Approval

2.                     Site plan and elevations received and dated November 27, 2019